site map     PL     RSS

 
   
 

 

 
 
 
 
 
 

certyfikat dla

Systemu Zarz±dzania

wg EN ISO 9001:2015

HMI / SCADA / MES system

 

 

 

references > application notes > cokeries > ZKZ

 

 

01.03.2005

 Supervisory and Control Systems for Coke Batteries in Zdzieszowice Cokery

 

ASKOM has designed, worked out and put into operation the modern supervisory and control system for 2 cocke batteries in Zdzieszowice Cokery. The plant produces about 4 mln tons of coke per year compared to 30 mln tons produced in European Union in 2003. The system implemented by ASKOM enabled to reduce maintenance costs, to keep coke quality at a stable level and to increase batteries availability by faster and more effective failures diagnosis. Coking process data gathered in the SCADA system are transferred to the supervisory system assisting in the batteries production management. The supervisory system functionality was specified in collaboration with the plant's engineers and Institute for Chemical Processing of Coal in Zabrze.

 

Application Note. Supervisory and Control System for Coke Bateries No. 7 and 8:

download    Format: PDF (527 KB)

 

Application Note. Sypervisory System for Coke Batteries No. 7 and 8:

download     Format: PDF (408 KB)

 

 

 



 

back

 

 
 
 

Created by ASKOM Sp. z o.o. © 2001

Ostatnia modyfikacja: 2012-01-05